Wivenhoe Small Hydro Installation / Wivenhoe Dam – QLD
Client
- GE Energy for Stanwell Corporation
Roles:
- Complete HV/LV Electrical Installation of 33kV Switchyard Structures
- Equipment and Electrical Installation of 4.6 MW Hydro Turbine within existing dam structure.
Return to top of Page