“2011″ – Juna Downs 220Kv Expansion Substation Project & SVC Installation – WA
Client:
ABB Australia for RIO TINTO.
Location:
Juna Downs 220Kv Substation Site Via Newman – Western Australia
Roles:
‘Brownfield’ Construction of 2 x new Feeder Bays and extension/integration of existing ‘LIVE’ 220kV Substation Switchyard.
Installation of High Voltage Equipment, including 220kV Circuit Breakers, 220kV Current Transformers, 220kV Capacitive Voltage Transformers, 220kV Surge Diverters, 220kV Disconnecting Circuit Breakers (DCB’s) & Earth Switches, and 220kV Power Voltage Transformers (PVT’s).
Electrical Erection and Installation of 220kV SVC (Static Var Compensator).
Installation of Structural Steel and Lighting/Lightning Towers.
Bus Bar and HV flexible Aerial Conductor Installations/Terminations.
Transformers HV/LV equipments, Controls Installations and Connections
Control Cabling & LV Power Installation Terminations & Commissioning.
Optical Fibre Communications Installations
Prefabricated Control SVC Switchgear Building Installation and Termination – 50T Unit
Pre Commissioning, Testing & Handover
Final Commissioning assistance, Testing & Handover to End Client