“2012” – Cape Lambert 220/132/33kV GIS Bulk Supply Substation – WA
2012 Completion
Cape Lambert 220/132/33kV GIS Bulk Supply Substation – WA
Client
- ABB Australia for RIO TINTO
Location:
- Cape Lambert- Western Australia
Roles:
- Electrical Erection & Installation of 220/132/33kV Substation Switching and Feeder Bays.
- Electrical Erection & Installation of 220kV GIS (Gas Insulated Switchgear) equipment.
- Installation of High Voltage Equipment, including 220kV & 132kV Circuit Breakers, Current Transformers, Capacitive Voltage Transformers, and Surge Diverters.
- 33kV/415v (200kVA) Pad Mount Transformers Installation, Terminations & Testing.
- Installation of Electrical Light, Power, Data, Fire & Air Con to GIS Building.
- Installation and Connection of Earth Bonding Strap to Building Exterior and Transformer Blast Walls.
- Installation of Structural Steel including Overhead Gantry Structures.
- Overhead Strung Bus Conductor Installations and Terminations.
- Bus Bar and HV Flexible Aerial Conductor Installations/Terminations & Testing.
- Installation, Termination and Testing of 33kV XLPE Feeder Cabling.
- Control Cabling and LV Power Installation Terminations & Commissioning.
- Transformer HV/LV equipment, Controls Installation & Commissioning.
- Optical Fibre Communications Installations.
- Installation, Termination and Commissioning of Prefabricated Control & HV Switchgear Buildings – 40T Units
- Pre Commissioning, Testing and Handover.
- Final Commissioning assistance, Testing & Handover to End Client.