“2011″ – Bulgarra & Pegs Creek 132/22Kv Sub Station Switchyard Upgrade Project
Client
- ABB Australia for HORIZON POWER
Location:
- Dampier- Western Australia
Roles:
- ‘Brownfield’ Construction/Extension to existing ‘LIVE’ 132/22kV Switchyards.
- Installation of High Voltage Equipment, including 132kV Circuit Breakers, 132kV Current Transformers, 132kV Capacitive Voltage Transformers, and 132kV Surge Diverters.
- 22kV/415v Pad Mount Transformers Installation, Terminations & Testing.
- Installation of 40 x ‘ABB’ 22kV Switchgear Modules.
- Installation of Structural Steel and Lighting/Lightning Towers.
- Overhead Strung Bus Conductor Installations and Terminations.
- Bus Bar and HV Flexible Aerial Conductor Installations/Terminations & Testing.
- Installation, Termination and Testing of 22kV XLPE Feeder Cabling.
- Control Cabling and LV Power Installation Terminations & Commissioning.
- Transformer HV/LV equipment, Controls Installation & Commissioning.
- Optical Fibre Communications Installations.
- Pre Commissioning, Testing and Cutover in existing Substation site.
- Final Commissioning assistance, Testing & Handover to End Client.