“2006″ – Braemar / Kogan Creek 275kV Switchyard Project, Electrical Erection / Dalby – QLD
Client
Roles:
- Extension of the existing switchyard to facilitate the installation of Incomer/Feeders for the Braemar and Kogan Creek Power Stations.
- Complete HV/LV Electrical/Mechanical installation and Installation of Gantry Structures
- 275kV HV Equipment installation and set-up
- Overhead strung bus
- HV flexible aerial connections
- ABB LTB C/Breaker installations
- Commissioning, Testing and Handovers

Return to top of Page