“2009″ – 7 Mile Power Station Project, 220kv Switchyard / Karratha – WA
Client
- ABB Australia for RIO TINTO – (EPCM – SKM Australia)
Location:
- Dampier- Western Australia
Roles:
- Electrical Erection and Installation of 8 x 220Kv Substation Switching and feeder Bays.
- Installation of High Voltage Equipment, including 220kV Circuit Breakers, 220kV Current Transformers, 220kV Capacitive Voltage Transformers, 220kV Surge Diverters, 220kV Isolators and Earth Switches, 220kV Line Traps and LMU’s.
- Installation of Structural Steel including Overhead Gantry Structures and Lighting/Lightning Towers.
- Overhead Strung Bus Conductor Installations and Terminations.
- Bus Bar and HV Flexible Aerial Conductor Installations/Terminations & Testing.
- Transformers HV/LV equipments, Controls Installations and Connections.
- Control Cabling & LV Power Installation Terminations & Commissioning.
- Optical Fibre Communications Installations & Terminations.
- Prefabricated Control Building Installation.
- Pre Commissioning, Testing & Handover.
- Final Commissioning assistance, Testing & Handover to End Client.